For Tilers

Construction documentation app for professional tilers and surface finishers

Record your work on-site and keep proof of the substrate quality, waterproofing layers, and the finished layout before other trades walk on your floors.

For Tilers

Construction documentation app for professional tilers and surface finishers

Record your work on-site and keep proof of the substrate quality, waterproofing layers, and the finished layout before other trades walk on your floors.

Trusted by construction pros across Germany

Icon

50+

Construction projects

Icon

4.8 ★

Rating

Icon

GDPR

Compliant

BSFZ

Certified

Trusted by construction pros across Germany

Icon

50+

Construction projects

Icon

4.8 ★

Rating

Icon

GDPR

Compliant

BSFZ

Certified

Trusted by construction pros across Germany

Icon

50+

Construction projects

Icon

4.8 ★

Rating

Icon

GDPR

Compliant

BSFZ

Certified

The Problem

The Problem

Work gets done. But it's not documented.

Work gets done. But it's not documented.

Unpaid extra work

You arrived and found the screed uneven or the walls out of plumb. You spent three hours leveling, but without a digital record, the client refuses to pay for the extra adhesive and labor.

Unpaid extra work

You arrived and found the screed uneven or the walls out of plumb. You spent three hours leveling, but without a digital record, the client refuses to pay for the extra adhesive and labor.

Disputes with clients

A leak appears in the bathroom six months later. Without photos of your tanking (waterproofing) and corner tapes before the tiles went up, you’ll be blamed for the water damage—even if it was a plumber's faulty pipe.

Disputes with clients

A leak appears in the bathroom six months later. Without photos of your tanking (waterproofing) and corner tapes before the tiles went up, you’ll be blamed for the water damage—even if it was a plumber's faulty pipe.

Rework & wasted hours

You finished a high-end natural stone floor, but the painters dropped a ladder or the kitchen fitters scratched the tiles. Without "as-built" photos, it’s your word against theirs.

Rework & wasted hours

You finished a high-end natural stone floor, but the painters dropped a ladder or the kitchen fitters scratched the tiles. Without "as-built" photos, it’s your word against theirs.

Lost time on reports

Your day doesn’t end when you clean your sponge. Stop trying to remember every meter of trim and matching blurry photos to room numbers while your dinner gets cold.

Lost time on reports

Your day doesn’t end when you clean your sponge. Stop trying to remember every meter of trim and matching blurry photos to room numbers while your dinner gets cold.

How it works

How it works

Create a construction daily report while you work.

Create a construction daily report while you work.

You don’t write reports. You record what happens on site.
You don’t write reports. You record what happens on site.

Step 1

Speak what you see

Voice-record substrate issues, moisture readings, or layout changes as you work.

Speak what you see

Voice-record substrate issues, moisture readings, or layout changes as you work.

Step 2

Add photos & videos

Snap evidence of waterproofing membranes, expansion joints, and the final cleaned surface.

Add photos & videos

Snap evidence of waterproofing membranes, expansion joints, and the final cleaned surface.

Step 3

Get a structured report

Everything is auto-organized into a timestamped daily report for your client or the main contractor.

Get a structured report

Everything is auto-organized into a timestamped daily report for your client or the main contractor.

What you document

What you document

Your construction log. Always complete.

Your construction log. Always complete.

⚠️

Poor substrates or moisture issues

Extra leveling, trims, and niche builds

🚧

Delayed starts or drying time issues

📈

Daily work progress

🔧

Rework and fixes

Proof when you need it

When something is questioned, you have proof.

Day 1

You arrive and realize the subfloor is cracked or not ready for tiling.

Action

Voice-record the site condition and snap a photo before you apply a single drop of primer.

Day 14

A crack appears in a tile. The client claims you didn't use an uncoupling membrane.

Action

You open the report. What, when, and how — all documented.

You show:

What was recorded
What was recorded
When it happened
When it happened
What it looked like
What it looked like
No discussion needed.

Start documenting your work on site!